RippleCore · Mobile · Prototype

Clickable prototype

Tap things. Toggle Pulse/Compact/★, open a drawing sheet, tap a media day or photo, open a Permit → see the document. Back arrows return. For Seth + Jon to click through and build from. Theme per THEME_ALIGNMENT_SPEC.md.

Projects. Tap Pulse / Compact in the header to switch density; tap the to filter to your favorites.
9:41
Projects
58 projectsPulseCompact
Search project, builder, owner…
All 58Overdue 2Blocked 1Flagged 3
Active Build· 8Contract$14.2M
204Cedar Ridge Apartments — Ph 2
MACascade Group · M. Alvarez
Framing12 open
198Harbor Point Medical Office
RBMeridian Health · R. Byrd
MEP rough-in8 open
Potential Lead· 23Projected$2.4M
233Oakmont Retail Center
JBOakmont LLC · J. Byrdziak
Bid sent2 open
Tap a project → its detail hub. Tap Compact or the above.
Home
Projects
Search
Me
Projects
58 projectsPulseCompact
Search project, builder, owner…
All 58Overdue 2Blocked 1
Active Build· 8Contract$14.2M
204Cedar Ridge Apartments — Ph 2 · Cascade12
198Harbor Point Medical · Meridian8
211Riverbend Estate · Private5
207Summit Ridge Warehouse · Summit9
Potential Lead· 23Projected$2.4M
233Oakmont Retail Center · Oakmont2
240Lakeside Townhomes · Shoreline0
Home
Projects
Search
Me
Projects
3 starredPulseCompact
My starred· 3 · across stages
204Cedar Ridge Apartments — Ph 2
MACascade Group · Framing
Framing12 open
198Harbor Point Medical Office
RBMeridian Health · MEP
MEP rough-in8 open
220Northgate Plaza
DLNorthgate Capital · Closing out
Closing out3 open
Tap the again to go back to all projects.
Home
Projects
Search
Me
Drawings. Full sheet list by discipline — tap any sheet to open the live viewer (markup pins · comments · revision delta). Back arrow returns.
9:41
DrawingsCurrent · 34 sheets
Search number, title, discipline…
Architectural· 12
A2.11 2nd Floor Plan
Rev C · new2
A2.12 Roof Plan
Rev B0
A4.01 Building Elevations
Rev B1
A5.02 Wall Sections
Rev A0
Structural· 9
S3.01 2nd Floor Framing
Rev C · new3
S3.02 Roof Framing
Rev B1
Mechanical · Electrical · Plumbing· 8
M2.01 HVAC — 2nd Floor
Rev B2
E4.01 Power Plan
Rev A0
Home
Projects
Search
Me
S3.012nd Floor FramingRev C
48'-0"W18×40S3.01REV C
C123
Rev C vs Rev B · 2 changes cloudedCompare
Markups & notes · 3
1
Beam upsized to W18×40 per RFI-12 — verify base plates.
R. Byrd · 2d · changed in Rev C
2
Blocking required at this bay for the mech hanger.
M. Alvarez · 1d
3
Field conflict with duct — coordinate with S3.02.
You · 3h ago · open
Drop a pin, add a note…
Documents. Read-only vault. Tap Permits & Approvals → tap a permit → see the document rendered on the phone.
9:41
DocumentsCedar Ridge · Ph 2read-only
Search documents…
Folders
0002 · Contracts12 files
0015 · Drawings & Specs34 files · synced
0018 · Permits & Approvals6 files · tap to open
0021 · Closeout & Warranties3 files
Tap Permits & Approvals
Home
Projects
Search
Me
Permits & ApprovalsDocuments · 6 filesread-only
Building Permit — BLDG-2026-0412.pdf820 KB · Jun 18 · approved
Electrical Permit — ELEC-2026-0198.pdf640 KB · Jun 24
Grading Approval — GRD-2026-0077.pdf410 KB · May 30
Tap the Building Permit to view it ↑
Home
Projects
Search
Me
Building PermitBLDG-2026-0412 · 1 of 2
CITY OF CEDAR RIDGEDEPARTMENT OF BUILDING & SAFETY
Building Permit
Permit No.BLDG-2026-0412
IssuedJune 18, 2026
ProjectCedar Ridge Apts — Ph 2
Address1420 Cedar Ridge Dr
TypeNew multi-family (V-A)
Valuation$1,840,000
ContractorCedar Ridge Builders
LicenseCA-B #1042887
Work authorized: 24-unit wood-framed apartment building, 2 stories over podium. Subject to all conditions on sheet 2. Inspections required per IBC 2021 §110.
✓ Approved
DownloadShare
Media. Tap the Daily album → tap a day for its detail → tap a photo for the lightbox. All the daily-log days live here.
9:41
MediaCedar Ridge · 42 items
All 42Daily 21Progress 9Before 6Inspections 4
Mon, Aug 3 · 6
Fri, Jul 31 · 5
Tap the Daily album ↑, or any photo.
Home
Projects
Search
Me
MediaDaily log · 21 days
All 42Daily 21Progress 9Before 6
Mon, Aug 3Open
6 photos · 8 crew · Clear 92° · 1 flag
Fri, Jul 31Submitted
5 photos · 9 crew · Clear 95°
Thu, Jul 30Submitted
3 photos · 8 crew · Partly cloudy 88°
Tap a day for its detail ↑
Home
Projects
Search
Me
Mon, Aug 3Daily log · open
Crew
8
Weather
Clear 92°
Photos
6
Flags
1
Photos · 6
Field log
Issues
Soft soil at NE corner — geotech called.
Materials
Rebar #5, 40 bags Type-S mortar.
Open the Daily Report
Photo 2 of 6
Footing formwork — north run
Mon, Aug 3 · 8:12 AM · M. Alvarez · GPS 34.05, -118.24
Estimates. Your web layout (Mobile-AI · Takeoff · Manual + pipeline) with Jon's flow. Tap an estimate or New estimate → the 7-step builder → Present to customer → Good/Better/Best.
9:41
EstimatesCedar Ridge · Ph 2
Lead3newQuote2draftingSigned1$120kBuild4activePunch1Done6
Mobile / AI· 2 · $48,000
Cedar Ridge Builders
Unit A — full remodel
$28,400Quote
GoodBetterBest
Cedar Ridge Builders
Clubhouse HVAC upgrade
$19,600Quote
Takeoff· 1 · $120,000
Cascade Group
Sitework package
$120,000Signed
New estimateWalk the site · Ripple builds Good / Better / Best
Home
Projects
Search
Me
New estimateUnit A — full remodel
TypeDiagnoseCapture4Build5Present6Sign7Pay
GoodBetterBest
Scope · 4 line items
Demo & haul-off
1 LS · $2,400/unit
$2,400
Framing — walls & headers Ripple
320 SF · $21.25/SF
$6,800
Electrical rough-in
1 LS · $4,200/unit
$4,200
Cabinets — shaker Ripple
18 LF · $533/LF
$9,600
Subtotal$23,000
Margin · 22%$5,400
Total — Better$28,400
Present to customer
PresentUnit A — pick an option
GoodEssentials
$21,900
Demo, framing, electrical
Builder-grade finishes
BetterRecommended
$28,400
Everything in Good
Shaker cabinets · quartz tops
Upgraded fixtures
BestPremium
$36,200
Everything in Better
Hardwood · custom tile · smart home
Send for e-signature
Project detail — the hub. The field-first cut of the 13 web tabs. Tap the quick tiles or section rows to jump into Media, Drawings, or Documents.
9:41
Cedar Ridge Apts · Ph 2#204 · Cascade Group
Cedar Ridge Apartments — Phase 2
1420 Cedar Ridge Dr · M. Alvarez (PM)
Active buildPhase Framing · 68%
The five-second read
Tasks
12 open
1 overdue · 2 due today
Contract
$1.84M
62% billed
Budget web
+18%
on budget
Milestone web
Slab pour
Aug 10 · 6 days
Do it now
Media
42 · 2h ago
Daily Log
3/5 · open
Tasks
12 open
Estimates
2 · $48k
Project
DrawingsSheets · markups · revisionsRev C · 2 new
DocumentsPlans, specs, contractsread-only
ActivityFeed, comments, @mentions5
Web-only on desktop: RFIs · Contracts · Gantt · Phase Plan · Financials.
Home
Projects
Search
Me
Daily report. The white-labeled shareable output (company logo · 6 field sections · photos). Tap a photo for the lightbox.
9:41
Daily Report
Submitted
Cedar Ridge Apartments — Ph 2
Monday, August 3, 2026
Submitted 5:24 PM · Foreman M. Alvarez
Crew
8
Weather
Clear 92°
Photos
6
Flags
1
Field record
Issues / Concerns
Soft soil at NE corner — geotech called to evaluate bearing capacity.
Delays
Slab pour postponed to Monday — afternoon storms.
Materials delivered
Rebar #5 (2 bundles) · 40 bags Type-S mortar.
Equipment on site
Excavator, skid steer, concrete pump on standby.
Visitors
City inspector — footing inspection 2 PM, passed.
Safety / Toolbox talk
Trenching & shoring. All 8 crew signed.
Photos · 6
Share PDF
Home
Projects
Search
Me
Photo 1 of 6
NE corner — soft soil flagged
Mon, Aug 3 · 2:04 PM · geotech review requested

Mockup prototype — UI/UX, not built. Colors, radii, type per ripple-mobile/THEME_ALIGNMENT_SPEC.md (red #CC0C1F · light-first · chrome #1B2433). Estimates fuses the web layout with Jon's 7-step AI flow.